71、Blocks are storage units one by oneand fach block is linkealby()in Blockchain.
A、Hash
B、DES
C、RSA
D、DSA
72、The organization shall undertake root causeanalysis and determine potential actions to preventthe occurrence or recurrence of().
A、changes
B、services
C、problems
D、incidents
73、The highest level of quality management is ().
A、detect and correct the defects before the desirables are sent头the customer as of the quality control process
B、use quality assurance to examine and correct the process it self and not just special defects
C、Incorporate quality into the ptanning and designing of the project and product
D、createa throughout the organization that is committed to quality in process and products
74、()helps to determine which individual project risks or other sources of uncertainty have the most potential impact onproject outcomes.
A、checklist analysis
B、sensitively analysis
C、decision tree analysis
D、simulation
75、In china,the security protection level of information system vs olivided into()levels.
A、3
B、4
C、5
D、6
>>>>>>点击进入软考报名专题
相关推荐:2021下半年系统集成项目管理工程师上午真题及答案解析
免责声明:
① 本站未注明“稿件来源”的信息均来自网络整理。其文字、图片和音视频稿件的所属权归原作者所有。本站收集整理出于非商业性的教育和科研之目的,并不意味着本站赞同其观点或证实其内容的真实性。仅作为临时的测试数据,供内部测试之用。本站并未授权任何人以任何方式主动获取本站任何信息。
② 本站未注明“稿件来源”的临时测试数据将在测试完成后最终做删除处理。有问题或投稿请发送至: 邮箱/279061341@qq.com QQ/279061341